Developing two multi-objective algorithms for solving multi-objective flexible job shop scheduling problem considering total consumed power per month

Message:
Abstract:
In this paper, to make flexible job shop scheduling problem (FJSP) more realistic, an operational factor is considered in its model. This factor, which is called optimizing total consumed electric power per month, is known as the most important factor in calculation of the electric cost of the industries. Considering this factor, specifically after subsides elimination of the country, has became more important. In addition to this objective, two other common objectives, called complementation time and critical work load of machines, are considered. To solve the multi-objective model, two algorithms, called multi-objective biogeography-based optimization algorithm (MOBBO) and multi-objective harmony search algorithm (MOHS), are developed and introduced to scheduling area for the first time. Finally, by developing some famous libraries of the problem, performance of the algorithms is compared statistically.
Language:
Persian
Published:
Journal of Industrial Management Studies, Volume:10 Issue: 27, 2013
Page:
113
magiran.com/p1123766  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!