Numerical Analysis of the Effect of Tunnel- Building Interaction on Surface Settlement
In the present research، the influence of tunnel construction of the 2nd Line of Mashhad Metro in the vicinity of Sadaf hotel has been chosen as the case study. It was aimed to investigate the ground displacements and surface settlement which has been induced by tunneling with Earth Pressure Balance-Shield Tunnel Boring Machine (EPB-TBM). FLAC-3D Tunnel، as finite difference software، have been employed to model the case.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.