Mathematical Modeling and Efficient Solving of a Production Re-Balancing Problem in Assembly Lines Considering Work-Station's Non-Smoothness

Message:
Abstract:
In production systems، line balancing is carried out once at beginning of line construction. In this situation، any change in market needs a new design of assembly line to meet market requirements. However this new design needs a lot of cost. Hence، a new type of assembly line balancing is proposed in this research in which a current assembly line is working. In this situation، a new cycle time is required due to some changes in market settings. Therefore، a multi-objective model titled assembly line re-balancing problem is proposed whose aim is to schedule tasks in such a way that new cycle time is realized via minimum changes in current assembly line. Moreover، work stations’ non-smoothness is considered as a relatively new measure. After modeling the problem، an efficient differential evolution algorithm was suggested to solve the problem.
Language:
Persian
Published:
Journal of Industrial Engineering Research in Production Systems, Volume:2 Issue: 4, 2015
Pages:
83 to 97
magiran.com/p1382187  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!