OPTIMIZATION OF SIAH BISHE PUMPED STORAGE POWER PLANT DAILY SCHEDULE USING A GENETIC ALGORITHM MODELING FRAMEWORK

Author(s):
Message:
Abstract:

Energy storage is an issue that scientists have been researching for many years. There are several energy storage alternatives, among which the pumped storage system, battery storage, superconducting magnets, ywheels, and compressed air are the most popular. Based on former research, pumped storage is the best method for energy storage. The pumped storage plant is an effective method to balance the di erence value between electricity demand and production, which has greatly expanded. The advantages of this system include a considerable capacity to store energy, a short-term response to power network uctuations, long-term energy storage and etc. Although there are many pumped storage plants under service, a comprehensive research have yet to be undertaken. The purpose of this research is optimization of daily planning, based on available data of an existing pumped storage plant. To achieve this aim, minimization of the di erence value between energy production and demand has been determined. A genetic algorithm was used for optimization. The genetic algorithm is a meta-heuristic algorithm. It is inspired by the genetic evolution of living creatures. This algorithm was used according to binary coding. The Siah Bishe pumped storage plant in Iran was the research case study. This plant includes two non-leveled reservoirs that are connected by two water tunnels. The di erence level of the reservoirs is approximately 500 meters. Two reversible pump-turbine units are applied in each tunnel, and all four pump-turbines have the same speci cations. There are three constraints for this problem: 1) the maximum and minimum water volume of upper and lower reservoirs, 2) the maximum and minimum water ow of the pump-turbine unit and 3) the stationary of exploitation. Based on the international electricity consumption pattern, it is assumed that energy consumption is constant during one hour, while it may change each individual hour. Finally, the solution is estimation of the ow rate into the tunnels over 24 hours.

Language:
Persian
Published:
Sharif Journal Civil Engineering, Volume:32 Issue: 1, 2016
Pages:
59 to 65
magiran.com/p1569501  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!