An Inventory- Scheduling Model for Supply Chain of Construction Project

Abstract:
One of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. This problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. Therfore, to better resources managmenet and also the improvement of supply chain condition, the time delay problem in resources supply can be solved by determining the optimal quantity of order in supply chain based on project constraints and required time for implementation of supply chain activities. Accordingly, in this paper a mamathemical model is proposed for determining the optimal quantity of orders and activities duration of supply chain, in which the total holding cost in project site and also supply chain cost are minimized. The mentioned model is first linearized and then by using the numerical examples, the results analyziz are presented.
Language:
Persian
Published:
Journal of Industrial Management, Volume:8 Issue: 20, 2016
Pages:
113 to 140
https://magiran.com/p1618663  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!