THE EASY PLAN PROGRAM AND OFFERING A FRAMEWORK IN SELECTING THE BEST DELAY ANALYSIS METHOD

Message:
Abstract:

Delays in the execution and operation of construction projects are of serious concern. In general, delay is described as any kind of extra time taken beyond previous mutual agreement. This is in uenced by a number of internal or external project parameters and often leads to problems and claims between owners, contractors and all parties involved. This issue is even more important in developing countries and is a crucial phenomenon for all involved parties of a contract. The importance of this issue has been compounded by the existence of di erent delay analysis methods and has made this issue a very challenging controversial area. Mostly, project managers and time scheduling analysts are faced with the problems of delay analysis and solving its induced claims. Furthermore, the system of delay analysis and evaluation is not included in most construction projects and, therefore, both contractor and owner may have di ering views on delay analysis and its corresponding responsibilities. Thus, estimation of delay e ects and determination of each party's responsibilities are critical. Hence, project managers and analysts must have an e ective and ecient systematic approach for analyzing delays and determining responsibilities. In this paper, rst, a general comparison on the current available methods for analyzing delays in construction projects is introduced. Then, a windows-based delay analysis, identi ed as a more accurate method than other e ective methods, is presented. The results of each method are discussed and compared through a case study run by the Easy Plan program. Windows-based methods are somewhat similar to each other but still have some di erences. Sometimes, their analysis results are di erent. The results of the present study demonstrate the limitations of each of these analysis methods and helps analysts in their proper selection. In fact, considering project conditions, analysts are assisted through de ning and providing some e ective rules.

Language:
Persian
Published:
Sharif Journal Civil Engineering, Volume:32 Issue: 4, 2017
Pages:
111 to 119
magiran.com/p1684399  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!