An Integrated Model for Analysis and Improvement of Scheduling “Flexible Manufacturing Systems (FMS)” and Dispatching “Automated Guided Vehicle (AGV)” Problems
Flexible manufacturing system scheduling is one of the most important and practical topics in manufacturing systems scheduling problems which could be affected by many features and subproblems. Considering them in FMS scheduling model in an integrated way leads to a feasible scheduling, and the model will not only be closer to the real settings in FMS environment but also its application in manufacturing systems will increase. This contribution takes into account manufacturing tasks and AGV dispatching scheduling problems simultaneously (in addition involving 2 subproblemsi machine loading, ii part routing problems implicitly). It provided a mathematical nonlinear mixed integer programming model. Having solved the model via Genetic Algorithm leaded to suboptimal solutions. Solving various examples, defining Lower and Upper Bounds and comparing them, demonstrate the quality of the solutions.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.