Two Level Catch-up in Iran Thermal Power Plant Manufacturing Industry

Message:
Abstract:
Latecomers should fill technology, management and marketing gaps in order to catch-up with leading companies. It seems that in large industrial groups, that produces complex systems and products, different capabilities at different levels are formed to fill the gaps with the leading companies. In this research Mapna Group Catch-up in thermal power plant manufacturing industry was investigated. The results show that catchup at group level encountered considerable complexity, but technological catch-up at factory level as a separable part of group catch-up had significant similarities with classic models. The role and importance of leveraging learning from technological cooperation along with internal targeted efforts in Mapna Group catch-up was also studied. The results can be used as a guide for large industrial group catch-up.
Language:
Persian
Published:
Journal of Science & Technology Policy, Volume:10 Issue: 1, 2017
Page:
69
magiran.com/p1745339  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!