Developing a Model to Recognize, Classify, and Analyz the Uncertainties Affecting the Selection of Strategic Partners in Resilient Economy (Case Study: National Iranian Oil Company)

Message:
Article Type:
Case Study (دارای رتبه معتبر)
Abstract:
Objective

Different and conflicting perspectives on the development of the country including the implementation of the resilient economy, relations with the West, securing the interests of the West, or ending the ties with the West, establishing relations with Arab countries and strengthening or ending the relations with neighboring countries, sanctions, uncertainties in the global prices of oil products, currency rate fluctuations, inflation rates, and etc. have hindered a coherent and strategic decision. It has led to numerous uncertainties in the selection of international strategic partner(s) in the oil industry. Therefore, the present research aims to provide a comprehensive framework to help identify and analyze the uncertainties affecting the selection of strategic partners in the context of the resilient economy in the National Iranian Oil Company.

Methodology

In this study, the most important uncertainties of oil projects were identified using thematic analysis technique and interviews with 15 experts. They were then classified according to the context of resilient economy. Finally, factor analysis was used to confirm the proposed classification.

Findings

The most important uncertainties of oil projects in the context of resilient economy belonged to the three general categories of uncertainty about the work environment (inflation, environmental safety and health standards, differences in political views and opinions, geological complexities and the number of wells which are need to be drilled, as well as frequent changes in macro-laws and policies), uncertainty about the guiding values (currency rate, global oil price, international issues and sanctions, changing market conditions and customer needs, as well as the lack of access to foreign equipment and machinery), and uncertainty about the options of the related project (insufficient technology or equipment, lack of interaction between the partners, bargaining power of the partners due to the exclusiveness of the technical knowledge, lack of operational experience among the partners, lack of timely completion of the facilities according to the project schedule so that the delay in commissioning of the facility will strongly affect the project economy).

Conclusion

After developing the model based on thematic analysis technique, LISREL output showed that the proposed model can provide an acceptable fit because the calculated chi-square value is equal to 1058.77, the ratio of chi-square to degree of freedom is lower than 3 (2.63 in this study), and the average squares of estimation errors is lower than 0.08 (0.012 in this study).

Language:
Persian
Published:
Quarterly Journal of Business Management, Volume:13 Issue: 47, 2021
Pages:
3 to 20
magiran.com/p2285299  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!