Enhancing Construction Process Employing Lean Principles and Discrete Event Simulation

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

Traditional push-based planning systems often result in several types of waste due to mainly improper distribution of resources. Waste may have several adverse effects on a project, including the increases in cost, duration, and emission. Thus, the practitioners and researchers have provided various lean production tools such as pull concept, implementation of supermarket concepts, and standardization to reduce waste and to enhance the execution process. Although researchers have attempted to transfer some lean manufacturing principles to the construction industry in the last two decades, the employment of some lean concepts (e.g., pull, standardization) in the construction has been challenging. On the other hand, employing a lean concept before the construction phase can be beneficial in identifying the waste of execution process and subsequently reducing time and cost the project. To evaluate the performance of lean concept scenarios before the construction phase, it seems necessary to employ a promising tool that can anticipate the various aspects of the execution process including resource utilization, time, cost, and process waste. Many researchers demonstrated the capability of Discrete Event Simulation (DES) to evaluate the implementation of optimal alternatives in the executive process planning. The traditional concept of lean manufacturing is borrowed in the current study to identify some sorts of wastes and existing bottlenecks over the executive steps of a construction process. However, due to difficulties in applying lean manufacturing on construction projects, this study proposes a simulation-based framework to evaluate various types of waste in the current situation before the commerce of the construction phase to enhance the future state in the construction industry. Such a hybrid framework integrating DES with lean concepts has been rarely used in the current and future planning phase of construction projects to evaluate the existing plan. The proposed approach is applied successfully to an actual construction case study in Tehran, Iran.

Language:
Persian
Published:
Sharif Journal Civil Engineering, Volume:37 Issue: 2, 2021
Pages:
39 to 49
magiran.com/p2402097  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!