A Contingency approach for implementing of Just-In-Time production system

Abstract:
The researches show that the implementation of Just-In-Time isnt unique in all situations. The implementation of this system may be differed in different companies, regions or countries and the some components that are needed to situations may be isnt vital in other situations. The purpose of this study is to identify elements and components that are critical to lust-In-Time success. This articles goal is proposing a method for this notification in lust-In-Time implementation by using antropy, TOPSIS and Pareto techniques. In this method we use TOPSIS and Pareto techniques for setting a priority and then selection of component and use entropy method for giving coefficient to TOPSIS matrix. At the end, in this case 5 components from 11 possible components in this system to implement in these companies have extracted.
Language:
Persian
Published:
Journal of Industrial Management Studies, Volume:5 Issue: 14, 2006
Page:
111
magiran.com/p801280  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!