A New Method for Calculating Project Progress Based on Multi Criteria Decision Making

Message:
Abstract:
This paper proposes a new method for precise calculation of the progress of projects with the aim of increasing accuracy and flexibility of project control. The merit of this method is that it is not only accepted by all the project components, but also it ensures the integrity of the project and its uniform scheduling. To achieve this purpose, project activities are weighted by group analytic hierarchy process (AHP) and the technique of order performance by similarity to ideal solution (TOPSIS) - which are two types of the multi-criteria decision making (MCDM) – and after being normalized they are used to achieve upper levels of reality, flexibility and accuracy in the field of progress measurement. Finally, for proving the validity of the method and its advantage over other methods, it is practically applied to a case study. The results are graphically illustrated by S-curve and statistically shown by analysis of variance.
Language:
Persian
Published:
Journal of Strategic Management in Industrial Systems, Volume:5 Issue: 14, 2011
Page:
31
magiran.com/p872918  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!