Optimal sizing and operation of an industrial CHP system for a gas engine prime mover
Author(s):
Abstract:
Distributed generation has recently received a great deal of attention in Iran, as a result of which CHP systems have been employed more, due to their higher efficiency. This article, aims to optimize the system size considering the operating strategy of an industrial case study. Size and operating strategy for the steam boilers are optimized. The problem has been solved by using GAMS software to optimize the Net Present Value (NPV) of the plant from the plant owner’s point of view. A sensitivity analysis has also been performed to illustrate the optimal solutions variation caused by altering several key parameters such as fuel and electricity prices.
Language:
Persian
Published:
Journal of Energy Engineering & Management, Volume:1 Issue: 1, 2012
Pages:
2 to 10
magiran.com/p973406
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!