  • Application of long-short pile retaining system in braced excavation
    Changjie Xu, Yuanlei Xu, Honglei Sun Pages 81-89
    In soft soil areas, equal-length piles are often adopted in the retaining system. A decrease in the bending moment value borne by the retaining structure along the pile depth (below the excavation bottom), leads to an inadequate use of the pile bending capacity near the pile bottom. This paper presents retaining systems with long and short pile combinations, in which the long piles ensure integral stability of the excavation while the short piles give full play to bearing the bending moment. For further analysis on pile and bottom heaves deformations and inner-force characteristics, three-dimensional models were built in order to simulate the stage construction of the excavation. The ratio between long and short pile numbers, and the effects on short pile length pile horizontal deformation, pile bending moment and bottom heave are investigated in detail. In the end, a feasible long-short pile combination is established. Obtained results from the simulation data and the field data prove that the long-short pile retaining system is feasible.
    Keywords: Long, short piles, Soft soil, Excavation, Retaining strutting system, FEM simulation
  • Numerical analysis on Buried pipes protected by combination of geocell reinforcement and rubber-soil mixture
    Dr. Gh. Tavakoli Mehrjardi, Prof. S.N. Moghaddas Tafreshi, Dr. A.R. Dawson Pages 90-104
    A numerical simulation of laboratory model tests was carried out to develop an understanding of the behaviour of pipes in a trench prepared with 3-Dimensional reinforced (namely "geocell-reinforced" in the present study) sand and rubber-soil mixtures, under repeated loadings. The study reports overall performance of buried pipes in different conditions of pipe-trench installations and the influence of pipe stiffness on backfill settlements, stress distribution in the trench depth and stress distribution along the pipe's longitudinal axis. Good agreements between the numerical results and experimental results were observed. The results demonstrate that combined use of the geocell layer and rubber-soil mixture can reduce soil surface settlement and pipe deflection and eventually provide a secure condition for buried pipe even under strong repeated loads.
    Keywords: Numerical analysis, Geocell, Buried pipes, Rubber, soil mixture, Stress transfer
  • The new empirical formula based on dynamic probing test results in fine cohesive soils
    Dr M. Khodaparast, Dr A.M. Rajabi, M. Mohammadi Pages 105-113
    The Dynamic Probe is an effective tool used in site investigation. It is more economic than the use of direct drilling, particularly in explorations with moderate depth. This paper presents an experimental study to investigate the capability of using dynamic probing to evaluate the shear strength and compaction percent of fine soil. A series of dynamic probe tests were carried out at 6 different sites in the Khozestan, Hormozgan and Qom provinces in the central and southern regions of Iran. The repeatability of the results is considered and new empirical equations relating the dynamic point resistance to undrained shear strength and compaction percent are proposed. For undrained shear strength evaluation of fine soils, i.e. clay and silty clay soils, a reliable site-specific correlation between qd and Cu can be developed when considering the correlation between log qd and log Cu. Also compaction present can be evaluated by qd. These equations can be developed to provide site-specific relationships based upon geotechnical data at each new location. Using this approach an estimation of the undrained shear strength Cu and compaction percent CP can be determined from dynamic probe tests with acceptable accuracy. The present paper also encourages the wider application of dynamic probing for site investigation in fine soils.
    Keywords: Dynamic probing, Repeatability, Undrained shear strength, Fine soil, Compaction percent
  • Centrifuge modeling of non-connected piled raft system
    A. Saeedi Azizkandi, M.H. Baziar, H. Rasouli, M. Modarresi, H. Shahnazari Pages 114-123
    In present research, 17 centrifuge tests have been conducted to study the effect of various parameters such as the number of piles, the distance between piles, gradation and thickness of the granular layer on the load-settlement behavior of a pile raft system. The results showed the importance of granular layer to reduce the settlement of non-connected pile raft system when the roles of piles are to reduce the settlement. In other words when the piles have major contribution on the bearing capacity of pile raft system, presence of a granular layer may increase the settlement.
    Keywords: Piled raft foundation, Non, connected piled raft, Load, settlement behavior, settlement reduction
  • A new seismic isolation system: sleeved-pile with soil-rubber mixture
    A. Komak Panah, A.H. Khoshay Pages 124-132
    To increase the safety of structures against strong ground motions and their life due to environmental issues on the earth and saving in terms of materials, it is necessary to expand and upgrade seismic resistant systems. However, more cost-effective systems which have sufficient influence on the seismic performance of structures and also more compatibility with the regional conditions, will be more desirable than other systems. One of the seismic resistance systems is seismic isolation. In the event of interest in using the seismic isolation system for a mounted building on piles, the costly construction of piles and isolation equipment shall be provided simultaneously. The seismic isolating using sleeved-piles which is generally used in combination with various damper systems, can help to overcome this issue. In this research a seismic isolator system using sleeved-pile has been studied while considering the damping behavior of the soil-rubber mixture as the only source of damping. To investigate the proposed system, a series of tests including static lateral load test, dynamic free and forced vibration tests, were performed on a model pile in a field laboratory which has been constructed for this purpose. According to results of tests the proposed system has a good deformation ability and damping characteristics, and as a method of seismic isolation is completely efficient.
    Keywords: Seismic isolation, Sleeved pile, Soil, rubber Mixture
  • A generalized plasticity constitutive model for sand-gravel mixtures
    Mehdi Goorani, Dr. Amir Hamidi Pages 133-145
    This paper presents a model for prediction of the mechanical behavior of sand-gravel mixtures using generalized plasticity and critical state concepts. Proposed model is based on the difference between critical state lines of sand and sand-gravel mixture in e-Lnp' plane. A generalized plasticity model is considered as the base model for sandy soil. Its state parameter, dilation rate and hardening function are modified to involve the effects of gravel particles on the behavior of mixture. Gravel content is considered as a physical parameter for determination of four new added parameters of the model. Verification of the proposed model performed considering four sets of experiments conducted by different researchers on poorly graded sand-gravel mixtures. According to the results, proposed model provides satisfactory qualitative and quantitative predictions of the behavior of sand-gravel mixture. Stress- strain behavior besides volumetric strains in drained condition and induced pore pressure during undrained loading are satisfactory predicted which indicates the possibility of its application in boundary value problems of geotechnical engineering.
    Keywords: Constitutive modeling, Sand, gravel mixture, Generalized plasticity, Critical state, Deviatoric stress, Volume change
  • Settlement analysis considerng sand mat induced initial settlement in soft ground improved by PBD
    Prof. T.H. Kim, S.H. You Pages 146-152
    The ground improvement using Plastic Board Drain (PBD) in soft soil was undertaken by sand mat formation, PBD installation, preloading surcharge, and removal of surcharge. During this procedure, the sand mat formation induced an initial settlement. However, it was very difficult to estimate that settlement due to PBD installation, which frequently destroyed the instruments installed in the ground. Consequently, the initial settlement was not properly included in total settlement. In this study, the initial settlement was estimated using ground level measurement and cone penetration test. Both predicted almost the same amount of initial settlement. The initial settlement is linearly increased with the depth of the sand mat. The degree of consolidation and the time of surcharge removal were estimated using the settlement included the initial settlement. Correct estimation of initial settlement is very important because it is a critical factor, which affects total settlement and the time of surcharge removal. If the initial settlement is not considered, the preloading surcharge may be overloaded or the time of surcharge removal may be predicted incorrectly. Consequently, the prediction of settlement, which requires to management of construction procedure of the project, may be wrong.
    Keywords: Initial settlement, Sand mat, Prediction settlement, Time of surcharge removal, Plastic board drain (PBD)