به جمع مشترکان مگیران بپیوندید!

تنها با پرداخت 70 هزارتومان حق اشتراک سالانه به متن مقالات دسترسی داشته باشید و 100 مقاله را بدون هزینه دیگری دریافت کنید.

برای پرداخت حق اشتراک اگر عضو هستید وارد شوید در غیر این صورت حساب کاربری جدید ایجاد کنید

عضویت

فهرست مطالب a. rozak

  • C. Jaqin, A. Rozak *, H. Hardi Purba
    Press automotive components manufacturer in Indonesia with the Overall Equipment Effectiveness (OEE) achievement was 60.7%, it was below than world company level as mention in Japanese Institute of Plant Maintenance (JIPM)- Total Productive Maintenance (TPM) standard, the biggest OEE components problem was availability value that achieved 63.3%, then the biggest availability problem was dies preparation time. Using TPM method and Plan-Do-Check-Act (PDCA) cycle with Pareto chart and Fishbone diagram, we succeeded to improve dies setting time within one months. We could increase the availability value from 63.3% became 67.8% and finally OEE value increased from 60.7% became 65.3%.
    Keywords: Total Productive Maintenance, Availability, Overall Equipment Effectiveness, Plan-do-check-act Cycle}
بدانید!
  • در این صفحه نام مورد نظر در اسامی نویسندگان مقالات جستجو می‌شود. ممکن است نتایج شامل مطالب نویسندگان هم نام و حتی در رشته‌های مختلف باشد.
  • همه مقالات ترجمه فارسی یا انگلیسی ندارند پس ممکن است مقالاتی باشند که نام نویسنده مورد نظر شما به صورت معادل فارسی یا انگلیسی آن درج شده باشد. در صفحه جستجوی پیشرفته می‌توانید همزمان نام فارسی و انگلیسی نویسنده را درج نمایید.
  • در صورتی که می‌خواهید جستجو را با شرایط متفاوت تکرار کنید به صفحه جستجوی پیشرفته مطالب نشریات مراجعه کنید.
درخواست پشتیبانی - گزارش اشکال