فهرست مطالب نویسنده:

reza lotfian

  • Reza Lotfian, Ezzeddin Bakhtavar *, Reza Mikaeil
    Cement-based materials are fundamental resources used to in construction. The increase in requests for and consumption of cement products, especially in Iran, indicates that more cement plants should be equipped. This study developed a geographical information system using pairwise comparison based on grey numbers to identify potential sites in which to set up cement plants. A group of five experts compared the effective criteria using the data for South Khorasan province. After filtering numerous sites, an area with potential locations for construction of a cement plant has been identified. The selection of a potential area considered the distance to mines, access roads, gas source, and faults. Classification maps were surveyed for land use, pedology, and topography. A potential area was resulted in the north of the province based on the importance weights of 0.307, 0.301, 0.17, 0.087, 0.082, 0.04, and 0.032 for the criteria of land use, proximity to mines, proximity to access roads, proximity to gas substations, topography, pedology, and proximity to faults, respectively.
    Keywords: Cement plant, limestone mine, grey pairwise comparison, Geographical Information System
  • عزالدین بخت آور *، رضا لطفیان
    تعیین مکان احداث کارخانه فرآوری یکی از تصمیم های مهم در مکان یابی و جانمایی تاسیسات معدن در طراحی پروژه های معدنی است. مساله مکان یابی کارخانه فرآوری را می توان یک مساله چندهدفه در نظر گرفت و با روش برنامه ریزی آرمانی آن را حل کرد. در این مقاله، برای حل مساله مکان یابی کارخانه فرآوری برای اولین بار رویکرد برنامه ریزی ریاضی آرمانی فازی توسعه و به کار گرفته شده است. به منظور تعیین کارآمدی این رویکرد در حل مساله مکان یابی، معدن مس سونگون مورد مطالعه قرار گرفت. در تعیین مکان کارخانه فرآوری برای این معدن، پنج آرمان نزدیکی به سنگ شکن، نزدیکی به سد باطله، نزدیکی به منبع برق، دوری از نقاط آتشباری و شیب توپوگرافی در نظر گرفته شدند. همچنین، شش گزینه عملی با بررسی نقشه محدوده معدنی شناسایی شده و در نهایت گزینه ها رتبه بندی شدند. در بررسی های عینی از محدوده و مکان های مورد بررسی، مشخص شد که با توجه به سطوح آرمانی اهداف انتخاب مکان کارخانه و وزن های اختصاص داده شده به آرمان ها، گزینه تعیین شده مکان ایده آل برای احداث کارخانه فرآوری این معدن بوده است.
    کلید واژگان: مکان یابی, کارخانه فرآوری, برنامه ریزی آرمانی فازی, مدلسازی ریاضی, معدن مس سونگون
    Ezzeddin Bakhtavar*, Reza Lotfian
    One of the most crucial decisions in mine design is to locate mine infrastructures. The problem of locating a processing plant can be considered in the form of a multi-objective case, which can be solved by goal programming method. In this paper, a fuzzy-based goal programming approach was developed in order to solve the problem of processing plant site determination. In order to determine the efficiency of the developed approach, Sungun copper area was studied. In this case, five goals were considered as adjacency to crusher, adjacency to tailing dam, adjacency to power source, distance from blasting sources, and topography of the available land. Furthermore, six feasible alternatives were initially specified by studying Sungun area map, and then were prioritized using the approach. After investigating the considered area, it was specified that the determined site is the most ideal alternative in this case, considering the levels of the goals and their fuzzy weights.
    Keywords: Site selection, Processing plant, Fuzzy goal programming, Mathematical modeling, Sungun Copper Mine
  • Ezzeddin Bakhtavar *, Reza Lotfian
    The accurate selection of a processing plant site can result in decreasing total mining cost. This problem can be solved by multi-criteria decision-making (MCDM) methods. This research introduces a new approach by integrating fuzzy AHP and gray MCDM methods to solve all decision-making problems. The approach is applied in the case of a copper mine area. The critical criteria are considered adjacency to the crusher, adjacency to tailing dam, adjacency to a power source, distance from blasting sources, the availability of sufficient land, and safety against floods. After studying the mine map, six feasible alternatives are prioritized using the integrated approach. Results indicated that sites A, B, and E take the first three ranks. The separate results of fuzzy AHP and gray MCDM confirm that alternatives A and B have the first two ranks. Moreover, the field investigations approved the results obtained by the approach.
    Keywords: Fuzzy theory, gray theory, site selection, open pit mining
بدانید!
  • در این صفحه نام مورد نظر در اسامی نویسندگان مقالات جستجو می‌شود. ممکن است نتایج شامل مطالب نویسندگان هم نام و حتی در رشته‌های مختلف باشد.
  • همه مقالات ترجمه فارسی یا انگلیسی ندارند پس ممکن است مقالاتی باشند که نام نویسنده مورد نظر شما به صورت معادل فارسی یا انگلیسی آن درج شده باشد. در صفحه جستجوی پیشرفته می‌توانید همزمان نام فارسی و انگلیسی نویسنده را درج نمایید.
  • در صورتی که می‌خواهید جستجو را با شرایط متفاوت تکرار کنید به صفحه جستجوی پیشرفته مطالب نشریات مراجعه کنید.
درخواست پشتیبانی - گزارش اشکال