جستجوی مقالات مرتبط با کلیدواژه "fixed time interval" در نشریات گروه "صنایع"
تکرار جستجوی کلیدواژه «fixed time interval» در نشریات گروه «فنی و مهندسی»جستجوی fixed time interval در مقالات مجلات علمی
-
Journal of Quality Engineering and Production Optimization, Volume:1 Issue: 1, Winter - Spring 2015, PP 1 -11This study investigates the coordination of production scheduling and maintenance planning in the flow shop scheduling environment. The problem is considered in a bi-objective form, minimizing the makespan as the production scheduling criterion and minimizing the system unavailability as the maintenance planning criterion. The time interval between consecutive maintenance activities as well as the number of maintenance activities on each machine are assumed to be non-fixed. A mixed integer programming formulation of the problem is presented. A special case of the problem, named as single server maintenance is also studied. Then, a bi-objective ant colony system algorithm is presented to solve the problem in focus. To obtain the appropriate components of the proposed algorithm, two sets of experiments are provided. Firstly, experiments are carried out to select the suitable heuristic method to build the heuristic information part of the algorithm between CDS and NEH. Secondly, experiments are reported to select the local search algorithm between iterated local search and adjacent pair-wise interchange. At last, experiments are generated to evaluate the performance of the proposed algorithm, comparing it to the results of an exhaustive search algorithm.Keywords: Flow shop scheduling, Preventive maintenance, Coordination, Non, fixed time interval, Ant colony system
نکته
- نتایج بر اساس تاریخ انتشار مرتب شدهاند.
- کلیدواژه مورد نظر شما تنها در فیلد کلیدواژگان مقالات جستجو شدهاست. به منظور حذف نتایج غیر مرتبط، جستجو تنها در مقالات مجلاتی انجام شده که با مجله ماخذ هم موضوع هستند.
- در صورتی که میخواهید جستجو را در همه موضوعات و با شرایط دیگر تکرار کنید به صفحه جستجوی پیشرفته مجلات مراجعه کنید.