A Multi-Mode Resource-Constrained Project Scheduling Model with Bi-random Coefficients for Drilling Grouting Construction Project

Author(s):
Message:
Abstract:
The aim of this paper is to deal with the multi-mode resource-constrained project scheduling problem under bi-random phenomenon in a practical large-scale water conservancy and hydropower construction project. A multiple objective decision making model with bi-random coefficients in the constraint is first proposed for practical drilling grouting project scheduling problem to cope with hybrid uncertain environment where twofold randomness exists. Subsequently, the chance constraint operator is employed to handle bi-random variable. Furthermore, particle swarm optimization algorithm is applied to search for the optimal solution. The results generated by computer validate the effectiveness of the proposed model and algorithm in solving large-scale practical problems.
Language:
English
Published:
International Journal of Civil Engineering, Volume:11 Issue: 1, Mar 2013
Page:
1
magiran.com/p1098754  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!