Assessment, Ranking and Clustering of Tunneling Risks in Seymareh Dam Using ELECTRE Method

Message:
Abstract:
Due to uncertain nature of tunneling projects, risk assessment can be considered as one of the most important managerial aspects in which resource allocation optimization is almost satisfied. Evaluation, ranking and clustering of the risks, which is performed on the basis of some specific criteria, provides a proper environment in responding to the possible risks. In this paper, identifying risks and their respective criteria of the risks of tunneling activities in Seymareh dam project (Iran), importance of each of the risks was determined using Elimination and Choice Translating Reality (ELECTRE) method. The collection and aggregation of the expert judgments were performed on basis of group decision-making and weighted average technique, respectively. According to the obtained results, the project risks are classified in 8 clusters and the most critical cluster involve economic, owner and technical risks.
Language:
Persian
Published:
Journal of Mining Engineering, Volume:6 Issue: 11, 2011
Pages:
57 to 69
magiran.com/p1208488  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!