Problem with Objectives of Minimizing Resource Costs and Minimizing Project Completion Time

Message:
Abstract:
A Resource Investment Problem is a project scheduling problem recently considered. In this issue, in contrast with other project scheduling, the project availability of needed resources level is considered decision variable and the goal is to find a schedule and resource requirement level. Researches regarding this field are related to optimizing an objective. In this paper, resource investment problem is studied for simultaneous optimization minimizing projectspan and project resource costs. Two multi-objective meta-heuristic algorithms, two process sub-population genetic algorithms and multi-population genetic algorithm are proposed to find solutions. According to evaluation criteria, the function of two algorithms is computationally compared and.
Language:
Persian
Published:
Journal of Industrial Management Studies, Volume:11 Issue: 29, 2013
Page:
1
https://magiran.com/p1246718  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!