Preliminary Construction Cost Estimation for Short Tunnels in Fair to Good Rock Mass Conditions
Author(s):
Abstract:
Cost estimation is one of the most critical tasks in prefeasibility studies and planning of tunnel construction projects. This paper presented a cost estimation model for excavation and support of short tunnels using uni-variate (UVR) and multi-variate regression (MVR) techniques. Hence، a database consisting of two explanatory variables including RMR and tunnel depth along with tunnel support and excavation costs was compiled from 12 tunnel sections in the North-West of Iran. The statistical significance and validity of the obtained models was checked by using some statistical tests، which proved that this model provides the possibility of a fast and adequate cost estimation of the excavation as well as support cost of tunnels at the phase of pre-feasibility study in tunnel projects.
Keywords:
Language:
Persian
Published:
Tunneling&Underground Space Engineering, Volume:3 Issue: 1, 2015
Pages:
79 to 87
https://magiran.com/p1355152