Evaluating and ranking construction projects contractors using F-PROMETHEE (A Case Study of Mehr Housing Project of Hashtgerd New Town)

Author(s):
Message:
Abstract:
In this paper a model for evaluating and ranking constructive projects will be presented. This model is based on six key criteria and a conceptual framework. These main evaluation criteria include: good history, Equipment and machinery, Management and technical staff, Economic - Financial, Skills and experience, and Scientific and technical capabilities. These criteria and their weights were derived from previous studies. The vagueness of the linguistic terms in the evaluation process required employment of fuzzy numbers. Then the fuzzy PROMETHEE method was used for the ranking the projects. To test the model and as a case study, contractors of Mehr housing projects in Hashtgerd new Town were ranked. This model can be used for evaluating and ranking contractors for various construction projects.
Language:
Persian
Published:
Journal of Industrial Management, Volume:7 Issue: 16, 2015
Pages:
175 to 188
https://magiran.com/p1421465  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!