Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
Author(s):
Abstract:
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies and evaluates critical risks of EPC projects using multi criteria decision making (MCDM) techniques. Then, by the means of developed earned value management (EVM) technique and considering Project Risk index (PRI), this work will proceed to estimate the degree of risk effects on project objectives. The optimal control measures (CMs) to address the risks are found through a goal programming model. The methodology was implemented on a case study in oil and gas industry in Iran. Results of this study show the impact of critical risks on objectives of EPC projects.
Keywords:
Language:
English
Published:
Journal of Industrial and Systems Engineering, Volume:8 Issue: 3, Summer 2015
Pages:
1 to 23
https://magiran.com/p1469668
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!