CoPS Projects Complexity: The 5P Model (Purpose, Product, Process, People, Peripheral)

Abstract:
The concept of "complexity" is familiar to many of project's managers; however, it is not comprehended by all in the same way. Researches conducted on this field have shown that the authors have difference understanding of "complexity" and their understanding mainly depends on their points of view. In fact, many identified aspects of the complexity in the literature are related to the aims of the research. This paper is an attempt to describe the complexity of project using three approaches; research literature(manufacturing and project complexity), interviews (deep interview with 20 experts) and questionnaire. The research was conducted on the Complex product and system (CoPS) projects. In addition, WH question technique was used. In conclusion, a 5p model (Purpose, Product, Process, People, and Peripheral) was introduced.
Language:
English
Published:
International Journal of Industrial Engineering and Productional Research, Volume:26 Issue: 4, Dec 2015
Pages:
311 to 333
magiran.com/p1522663  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!