Multi-Stage Production Planning with Sequence-Dependent Setups and Setup Carry Over In Closed-Loop Supply Chain
Author(s):
Abstract:
This paper studies multi-stage, multi-product, multi-period production planning problem with sequence dependent setups in closed-loop supply chain. Manufacturing and remanufacturing processes of each product are regarded consequently, and both of them could be performed if machine is ready for processing corresponding product. To formulate the problem, a mixed-integer programming (MIP) model is presented and four heuristic algorithms using rolling horizon and a genetic algorithm are developed to solve the model. First two heuristic algorithms are developed based on the original model, but to solve the large instances the other two heuristics and the genetic algorithm are based on the simplified model, which is obtained by elimination of non-permutation sequences of original model solution space. To calibrate the parameters of the proposed genetic algorithm, Taguchi method is applied. The numerical results indicate the efficiency of the proposed meta-heuristic algorithm against MIP-based heuristic algorithms.
Keywords:
Language:
Persian
Published:
Journal of Industrial Engineering Research in Production Systems, Volume:4 Issue: 9, 2017
Pages:
239 to 255
https://magiran.com/p1702593
مقالات دیگری از این نویسنده (گان)
-
Multi-period home health care routing and scheduling problem with the medical grouping of patients
E. Arabzadeh, S.M.T. Fatemi Ghomi *, B. Karimi
Scientia Iranica, Sep-Oct 2023 -
Optimal bidding in a participative mechanism with bundling and rebidding options
Mahya Hemmati, Seyed Mohammad Taghi Fatemi Ghomi*, Mohsen Sheikh Sajadieh
Journal of Industrial and Systems Engineering, Winter 2023