Scheduling of construction projects using a combination of multi-objective programming and optimization via simulation
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
In the single-mode resource-constrained project scheduling problem, it is assumed that each activity has a specified known execution time and resource consumption can be done only in one way. In practice, there are many cases in which the make span can be reduced by providing additional resources activities. In this case, each activity can be done in one of the procedures, which is called the multi-mode resource-constrained project scheduling. In this paper, the problem includes determination of the basic schedule for the project activities which may be done in several models and the precedence relations are met, While the project make-span, cost and resource fluctuations are minimal. In this research project scheduling problem network will model using ED simulation software and the results of the simulation and a meta-heuristic algorithm has been compared. Finally, management strategies to optimize the scheduling, i.e such minimize total time, cost and resource leveling, will be offered.
Keywords:
Language:
Persian
Published:
journal of Production and Operations Management, Volume:8 Issue: 2, 2018
Pages:
83 to 98
https://magiran.com/p1800713
مقالات دیگری از این نویسنده (گان)
-
The Use of Internet of Things and Big data in the Food Bank Supply Chain Problem: A Case Study of Tehran Municipal Districts
Alireza Hashemibakhshi, Amir Daneshvar *, Seyed Mohammadali Khatami Firouzabadi, Hassan Javanshir
Journal of Industrial and Systems Engineering, Summer 2023 -
A Simulation-Based Bi-Objective Optimization Model for Supply Chain Inventory Replenishment: A Case Study of the Electric Industry
Behzad Moghimi Shahri, Ali Khatami Firouzabadi *, Maghsoud Amiri, Parha, M Azimi
Journal of Industrial Management Perspective,