An Approach Based on Earned Value Method to Solve the Problem of Minimizing the Total Costs of Earliness and Tardiness in Research and Development Projects
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
The costs of earliness and tardiness are considered as the major challenge of research and development projects. These projects need a more effective method for scheduling and control. Such methods help executives to properly detect the deviations of strategic projects from performance baseline and to adopt appropriate decisions about project activities. In this regard, the Earned Value Method (EVM) can be applied effectively. In this study, a scheduling algorithm is introduced to have high efficiency in minimizing the total earliness and tardiness costs. Practitioners can precisely predict the total time and cost of the project and also adopt appropriate decisions to prevent strategic projects from further financial losses using this technique. The execution of the proposed approach in real cases revealed that it lessens the total costs of earliness and tardiness. Furthermore, the efficiency of the proposed technique in solving the problem was compared to scheduling algorithms in previous studies. In this regard, the TTR index was used that represents the total earliness and tardiness time divided by the project time. The results showed that the proposed algorithm has higher efficiency in minimizing the total costs of earliness and tardiness in research and development projects.
Keywords:
Language:
Persian
Published:
Journal of Industrial Technology Development, Volume:17 Issue: 36, 2019
Pages:
17 to 30
https://magiran.com/p2022499
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!