Risk Ranking Water Transmission Lines Project Using Fuzzy Decision Process
Author(s):
Article Type:
Research/Original Article (بدون رتبه معتبر)
Abstract:
Risk management is an integral part of a project's success and is a process that helps identify early problems and thus take steps to prevent them from becoming real problems in the future. In this paper, multi-criteria decision making methods are used as a quantitative approach to prioritize identified risks in the project. Finally, after reviewing the problem conditions, a multi-criteria decision-making method for ranking the project risks in fuzzy mode is introduced and the application of this approach in the water transmission line industry by using fuzzy TOPSIS method as a case study of the tropical design project - Part 2 Is located.
Keywords:
Language:
Persian
Published:
Civil and Project Journal, Volume:1 Issue: 4, 2019
Pages:
40 to 52
https://magiran.com/p2034780
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!