Model of a Work Breakdown Structure (WBS) Framework and AOA Diagram for Efficient Project Management of Lead â Zinc Skarn Exploration with Exploratory Data
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
During recent years, investment in mineral resources exploration projects has been significantly growth in Iran. Since the implementation and completion of exploration projects require effort, long time and high cost as well as project managers technical capability, management techniques such as work breakdown structure in mineral exploration can prevent of wasting time and costs on these exploration. Skarn deposits exploration projects, as an important source of iron, copper, gold, lead and zinc, include major exploration projects. Skarn deposits are one of the most widespread types of deposits in the earth's crust and has been the subject of many studies over the centuries. Today, using of various techniques and methods of exploration can be these deposits more carefully studied, assessment and explored. In this paper, have been tried to used of project management knowledge and work breakdown structure, a appropriate model to perform the early stages of exploration of lead – zinc skarn and finally combining the results in the GIS environment for mineral potential mapping in Mahneshan area be provided.
Keywords:
Language:
Persian
Published:
Journal of Modeling in Engineering, Volume:16 Issue: 53, 2018
Pages:
89 to 100
https://magiran.com/p2040819
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!