Determination Maintenance Strategies using multi-stage Fuzzy Inference System (the case study of shahid salimi's power plants)
Maintenance and Repairment is important, because Efficient Management can be very Effective in Countinuity Production Lines and Reduce Costs. This Problem is very important in power plants as the main resource of energy supply in the country. The Purpose of This Paper is to Presentation a Practical Approach to Determine Maintenance Strategy that is Suitable for any Device. In This Regard, the Fuzzy FMEA Approach and Design Fuzzy Inference System Evaluated the Risk of Critical Failures; as well as the Intensity also was assessed for Futher Investigation; Combining these Results, Appropriate Maintenance Strategy each Device was Determined. The Results Show, the “Generator” as the main unit of Electricity Production in Power Plants, with the Risk Priority Number of 6.56 and Intensity of 0.55 in the Fourth Dimention of Graph RPN-TI has been. In This Case, the Appropriate Strategy for this Device, the Maintenance Strategy is Proactive. Since the Devices include: Ayrpryhytr, Turbine Condenser, F-D Fan and Electro-motor with RPN high and Low TI; in the Third Dimention of Graph have been, Strategy Condition- based on the Situation is the Appropriate Strategy for their Maintenance.
-
A hybrid fuzzy decision-making approach for evaluating the suppliers based on industry 5.0 and viable supply chain dimensions: a case study in medical devices manufacturing
Zeinab Asadi, Hassanali Aghajani *, Mohammad Valipourkhatir, Erfan Babaee Tirkolaee
Journal of Decisions and Operations Research, -
Identifying and Analysis of impacting factors on implementation of social manufacturing in apparel industry in Iran using Fuzzy DEMATEL-ISM method
Hadi Esmaeili Ahangarkolaei, , Iraj Mahdavi
Journal of Executive Management,