On Single Machine Scheduling Problem with Distinct due Dates under Fuzzy Environment

Author(s):
Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Single machine, distinct due dates, early (lately) machine problem and fuzzy environment closely to the situation faced by '' just in time '' manufacture. This paper attempts to sequence the jobs on a single machine scheduling problem with distinct due dates under fuzzy environment so as to minimize the total penalty cost. This cost is the composition of all the total earliness and tardiness cost. A method to minimize the total penalty cost due to earliness or lateness of job in fuzzy environment is proposed. A numerical example is given in the sake of the paper to support this study.
Language:
English
Published:
International Journal of Supply and Operations Management, Volume:7 Issue: 3, Summer 2020
Pages:
272 to 278
magiran.com/p2185820  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!