Expected Proportional Hazard Model in Preventive Maintenance

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:

Whether directly in the form of expenses or indirectly, the objective of maintenance in the mining industry is self-evident in time losses and loss of production. In this paper, the reliability-based maintenance is examined with a different insight than before. The system goes back to the Good As New (GAN) state or too Bad As Old (BAO) maintenance state; why so, the maintenance of the system shifts to the midrange state. On the other hand, the implementation of repairs is strongly influenced by the environmental factors that are known as the “risk factors”. Therefore, an analysis requires a model that integrates two basic elements: (1) incompleteness of the maintenance effect and (2) risk factors. Thus, an extensive proportional hazard ratio model (EPHM) is used as a combination of the Proportional Hazard Model (PHM) and the Hybrid Imperfect Preventive Maintenance model (HIPM) in order to analyze these elements. In this regards, four different preventive maintenance strategies are proposed. All four strategies are time-based including constant interval or periodic (the first and second strategies) and cyclic interval (the third and fourth strategies). The proposed method is applied for a Komatsu HD785-5 dump-truck in the Songun copper mine as a case study. The PM intervals with a mean value of risk factors for the four activities to reach the 80% reliability for the first and second strategies are about 5 and 48 hours. These intervals for the third strategy are calculated as 48.36, 11.58, 10.25, and 9.035, and for the fourth strategy are 5.06, 4.078, 3.459, and 1.92.

Language:
English
Published:
Journal of Mining and Environement, Volume:12 Issue: 3, Summer 2021
Pages:
753 to 767
https://magiran.com/p2330591  
سامانه نویسندگان
  • Nouri Qarahasanlou، Ali
    Corresponding Author (1)
    Nouri Qarahasanlou, Ali
    Assistant Professor Mining, Imam Khomeini International University, قزوین, Iran
  • Ataei، Mohammad
    Author (2)
    Ataei, Mohammad
    Full Professor Mining, Shahrood University of Technology, شاهرود, Iran
  • Shakoor Shahabi، Reza
    Author (3)
    Shakoor Shahabi, Reza
    Associate Professor Mining Engineering Department, Engineering Faculty, Imam Khomeini International University, قزوین, Iran
اطلاعات نویسنده(گان) توسط ایشان ثبت و تکمیل شده‌است. برای مشاهده مشخصات و فهرست همه مطالب، صفحه رزومه را ببینید.
مقالات دیگری از این نویسنده (گان)