Prioritization of construction of irrigation structures with multi-criteria decision making methods and PMBok failure structure in conditions of uncertainty
Huge investments are being made in the development of water resources for the construction of water storage and transmission systems for agricultural irrigation networks. Since each project is unique in terms of region and geographical location, and potential unrecognized risks arise during project implementation, a relatively accurate financial estimate cannot be calculated with certainty. The existence of these risks is a waste of investment. One of the effective measures that can be taken to reduce this depreciation is risk management. Risk management in PMBOK standard includes risk identification based on expert opinions and risk rating based on two criteria: probability of occurrence and severity of impact. Agricultural irrigation of Sistan plain, which uses different structures to store water and irrigate fields, has been studied in a case study in this study. In this research, the Delphi method is used to identify the risks and the hierarchical analysis process method is used to rank them. The risks of weather conditions and lack of commitment to perform accurate work on defined quality irrigation structures are assigned the highest score. have given. In order to prioritize several projects in Sistan region, taking into account the identified risks, Vickor method has been used, which shows the construction of first-class pressure irrigation structures, construction of pumping station and second-line transmission pipeline, construction of structures Irrigation greenhouses ranked third and irrigation structures of concrete canal ranked fourth for implementation with the lowest risk cost in this area.
Rough numbers , VIKOR , AHP , Delphi , risk
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.