The problem of Resource Leveling in Multi-Project Mode by Cuckoo Optimization Algorithm
Author(s):
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Resource leveling is very important in projects and project managers always need a schedule based on the optimal use of resources needed to complete their projects. Most resource leveling research has been done in a single project, while in many organizations several projects are done simultaneously. For this purpose, a mathematical model is presented by all projects with the aim of minimizing changes in the level of different resources. Leveling and allocating resources is one of the most basic tasks of project management. Typically, project management uses specific methods such as GERT and PERT to plan and control the project (Boctor, 1990). Because the problem of resource leveling is an NP-complete problem and it is not possible to achieve the optimal solution in the general case (Guo et al., 2012), the cuckoo optimization algorithm has been used, which is one of the newest and most efficient evolutionary optimization methods.
Keywords:
Language:
Persian
Published:
Journal of Civil and Environmental Engineering University of Tabriz, Volume:53 Issue: 1, 2023
Pages:
187 to 197
magiran.com/p2593155
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یکساله به مبلغ 1,390,000ريال میتوانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.
In order to view content subscription is required
Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!