Tasks scheduling with different structures in cloud manufacturing according to the time and cost of transportation and the task arrival time

Message:
Article Type:
Research/Original Article (دارای رتبه معتبر)
Abstract:
Purpose

Cloud manufacturing is a service-oriented production model that centralizes production resources to respond to specific customer needs in different locations. One of the main issues in cloud manufacturing systems is the proper allocation of sub-tasks to enterprises and their optimal scheduling. Most studies assume that all tasks have only one type of structure, although it is possible to have tasks with different structures in one order set. Furthermore, existing scheduling models in the cloud manufacturing literature tend to assume that all tasks are available at time zero and that the logistics time/cost among enterprises is negligible. Therefore, in this study, an optimization model with three objective functions of task completion time, the cost imposed on the cloud manufacturing system, and the quality of the selected services are developed to get closer to the real world; three features are included in it: 1) the possibility of tasks with two structures, series and parallel, 2) different arrival times of tasks in the cloud manufacturing system, and 3) time/cost of logistics between different enterprises.

Methodology

First, six examples with different numbers of tasks and subtasks are designed with both sequential and parallel structures. To solve the proposed model accurately and achieve the global optimum, the CPLEX solver is used in the GAMS software.

Findings

To verify the importance of the characteristics of the developed model, two comparative studies are carried out. In the first comparative study, the presented model is compared with a similar model in which it is assumed that all tasks are available at time zero. The second comparative study examines the effect of considering logistics time/costs between enterprises when allocating subtasks to services. The results of the comparative studies show the misleading level of the cloud manufacturing manager in the face of the reduced models.

Originality/Value:

 This research aims to present a model for the simultaneous scheduling of tasks with sequential and parallel structures, considering the different task arrival times and logistics in the cloud manufacturing system.

Language:
Persian
Published:
Journal of Decisions and Operations Research, Volume:9 Issue: 1, 2024
Pages:
64 to 79
https://magiran.com/p2719776  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!