Efficiency comparison of Timber Jack 450C skidder in planned and unplanned logging system (Case study: second district of Nave-Asalem)

Message:
Abstract:
In this study, wood extract production and costs were assessed in the planned and unplanned (conventional) logging system. The research was carried out in compartments No. 23 and 25 of second district of Nave-Asalem forest. Work study technique based on IUFRO guideline was used to calculate system hourly production. Based on guideline of Forest, Range and Watershed Organization (FRWO) of Iran, system hourly cost was calculated. Results showed that planning skid trails and landings before tree felling as well as using directional felling technique increased hourly skidder production from 12.72m3 to 18.8m3. Increase of production, reduced the extraction cost from 103015 to 69372 Rials per cubic meter. These extraction costs include landing construction costs in planned harvesting and road maintenance costs in unplanned logging system.
Language:
Persian
Published:
Iranian Journal of Forest and Poplar Research, Volume:16 Issue: 4, 2008
Page:
649
magiran.com/p634939  
دانلود و مطالعه متن این مقاله با یکی از روشهای زیر امکان پذیر است:
اشتراک شخصی
با عضویت و پرداخت آنلاین حق اشتراک یک‌ساله به مبلغ 1,390,000ريال می‌توانید 70 عنوان مطلب دانلود کنید!
اشتراک سازمانی
به کتابخانه دانشگاه یا محل کار خود پیشنهاد کنید تا اشتراک سازمانی این پایگاه را برای دسترسی نامحدود همه کاربران به متن مطالب تهیه نمایند!
توجه!
  • حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران می‌شود.
  • پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانه‌های چاپی و دیجیتال را به کاربر نمی‌دهد.
In order to view content subscription is required

Personal subscription
Subscribe magiran.com for 70 € euros via PayPal and download 70 articles during a year.
Organization subscription
Please contact us to subscribe your university or library for unlimited access!