به جمع مشترکان مگیران بپیوندید!

تنها با پرداخت 70 هزارتومان حق اشتراک سالانه به متن مقالات دسترسی داشته باشید و 100 مقاله را بدون هزینه دیگری دریافت کنید.

برای پرداخت حق اشتراک اگر عضو هستید وارد شوید در غیر این صورت حساب کاربری جدید ایجاد کنید

عضویت

جستجوی مقالات مرتبط با کلیدواژه « distributed generator » در نشریات گروه « برق »

تکرار جستجوی کلیدواژه «distributed generator» در نشریات گروه «فنی و مهندسی»
  • Nguyen Cong Chinh*

    This paper presents an intelligent meta-heuristic algorithm, named improved equilibrium optimizer (IEO), for addressing the optimization problem of multi-objective simultaneous integration of distributed generators at unity and optimal power factor in a distribution system. The main objective of this research is to consider the multi-objective function for minimizing total power loss, improving voltage deviation, and reducing integrated system operating costs with strict technical constraints. An improved equilibrium optimizer is an enhanced version of the equilibrium optimizer that can provide better performance, stability, and convergence characteristics than the original algorithm. For evaluating the effectiveness of the suggested method, the IEEE 69-bus radial distribution system is chosen as a test system, and simulation results from this method are also compared fairly with many previously existing methods for the same targets and constraints. Thanks to its ability to intelligently expand the search space and avoid local traps, the suggested method has become a robust stochastic optimization method in tackling complex optimization tasks.

    Keywords: Meta-Heuristic Algorithm, Improved Equilibrium Optimizer, Voltage Deviation, Total Power Loss, Distributed Generator}
  • سید اسماعیل نقیبی، محمد میرزایی*، تقی بارفروشی

    امروزه با نوجه به گسنرش و توسعه شبکه انتقال انرژی و بکارگیری مولدهای مقیاس کوچک و افزایش ظرفیت مراکز تولید، سطح اتصال کوتاه شبکه افزایش قابل ملاحظه ای پیدا کرده است. افزایش سطح اتصال کوتاه مشکلات متعددی را برای تجهیزات شبکه ایجاد می نماید. لذا می بایست به طریقی بتوان شدت آن را کاهش تا آثار آن تضعیف شود که یکی از این روش ها بکارگیری محدودساز جریان خطا می باشد. در این مقاله به جهت انجام مطالعه موردی، اثرات بکارگیری محدود کننده جریان خطای بین خطی، برای کاهش جریان اتصال کوتاه و بهبود پایداری مولدهای مقیاس کوچک متصله در یک پست نمونه مورد بررسی قرار می گیرد. پست 20/63/230 کیلوولت منطقه ویژه اقتصادی بندر امیرآباد شامل چندین فیدر خروجی برای اتصال بارها و چهار مولد مقیاس کوچک به شین مشترک 20 کیلوولت می باشد. در این پست اتصال مولدهای مقیاس کوچک برای تامین توان مورد نیاز مصرف کنندگان، باعث افزایش جریان اتصال کوتاه به مقداری بیشتر از ظرفیت نامی تجهیزات منصوبه شده و بروز اتصال کوتاه در یکی از فیدرها، منجر به کمبود ولتاژ در باس مشترک و ناپایداری مولدها گردیده است. این امر باعث خروج مولدهای مقیاس کوچک و بارهای حساس متصل به فیدرهای موازی و کاهش قابلیت اطمینان شده است.   در این مقاله به جهت کاهش جریان اتصال و جلوگیری از خروج مولدهای مقیاس کوچک و بارهای حساس در این پست، محدودساز بین خطی پیشنهاد گردیده است. این محدود کننده از چندین مدار یکسوساز و یک مقاومت محدود ساز مشترک تشکیل شده است که در صورت بروز اتصال کوتاه در هر یک از فیدرها، با قرار دادن مقاومت محدود ساز مشترک در مسیر جریان خطا، دامنه جریان و متعاقبا دامنه افت ولتاژ نیز محدود می گردد. برای اثبات کارآیی ساختار پیشنهادی در رفع مشکلات شبکه مورد مطالعه، اجزاء پست در نرم افزار PSCAD/EMTDC مورد شبیه سازی و بررسی قرار گرفته است. نتایج شبیه سازی ها نشان می دهد که محدود کننده پیشنهادی به طور موثری باعث کاهش جریان خطا و کاهش افت ولتاژ و همچنین بهبود پایداری مولد های مقیاس کوچک می گردد.

    کلید واژگان: جریان اتصال کوتاه, کمبود ولتاژ, محدود ساز جریان خطا بین خطی, مولد مقیاس کوچک}
    Seyed Esmaeel Naghibi, Mohammad Mirzaie*, Taghi Barforoushi

    Due to the expansion and development of the distribution networks and the use of distributed generators (DGs), the level of short-circuit current has increased significantly. Increasing the short circuit current level provides several challenges for network equipment. In this paper, the effects of using the inter-line fault current limiter (IFCL) to reduce the short-circuit current and improve the stability of DGs installed in the 230/63/20 kV AMIRABAD substation as a case study are investigated. It includes several output feeders for connecting loads and four DGs to a common coupling point 20 kV bus. In this substation, the connection of DGs to supply the power required by consumers, has increased the short-circuit current to a greater amount than the nominal capacity of the equipment. Also the occurrence of short-circuit in one of the feeders has led to voltage sag in the common bus and the instability of the generators. This has caused the exit of generators and sensitive loads connected to parallel feeders and finally reduce the reliability. IFCL consists of several rectifier bridge circuits and a common limiting resistor. It inserts the common limiting resistor in fault path for limiting the fault current level and consequently the voltage drop in the case of short circuit of the feeders. To prove the efficiency of the proposed structure for solving the problems of the studied network, the substation components in PSCAD / EMTDC software are simulated. The simulation results show that the proposed IFCL effectively reduces the fault current and voltage drop, as well as improves the stability of DGs.

    Keywords: short circuit current, voltage sag, Interline bridge‐type fault current limiter, distributed generator}
  • Shankarshan Prasad Tiwari, Ebha Koley*

    In recent years, DC microgrid has attracted considerable attention of the research community because of the wide usage of DC power-based appliances. However, the acceptance of DC microgrid by power utilities is still limited due to the issues associated with the development of a reliable protection scheme. The high magnitude of DC fault current, its rapid rate of rising and absence of zero crossing hinders achieving reliable protection in DC microgrid. Further, the intermittency associated with the non-conventional distributed generators demands adaptiveness under varying weather conditions. In this paper, the above-mentioned issues are addressed by developing a bagging tree-based protection approach for a multi-terminal DC microgrid. The proposed scheme addresses the intermittency associated with renewable sources. It performs the functions of mode detection, fault detection/classification, and faulty section identification using local information of current and voltage signals only. The same avoids the communication network related drawbacks like data loss and latency.

    Keywords: DC Microgrid Protection, Islanded Mode, Pole to Ground Fault, Pole to Pole Fault, Distributed Generator}
  • سید احسان احمدی، نوید رضایی*
    این مقاله یک مدیریت انرژی توزیع شده انعطاف پذیررا برای هماهنگی بهره برداری ریزشبکه های متصل به هم پیشنهاد می دهد. هرکدام از ریزشبکه ها به عنوان یک واحد مستقل با اهداف محلی در نظر گرفته شده اند تا هزینه های بهره برداری و توان های مبادله شده خود را بهینه نمایند. در این مقاله فرض شده است که ریزشبکه های متصل به هم ازطریق یک شین مشترک به هم متصل شده اند که می توانند ازاین طریق توان های الکتریکی را مبادله کنند. برای هماهنگ کردن برنامه ریزی بهره برداری این ریزشبکه ها، از یک الگوریتم دوسطحی استفاده شده است. سطح اول برای بهره برداری اقتصادی هرکدام از ریزشبکه ها و سطح دوم برای بهینه سازی توان های مبادله شده است. برنامه ریزی ریزشبکه ها با درنظرگرفتن روابط پخش بار و قیود ولتاژ در یک سیستم متصل از چند ریزشبکه در یک دوره 24 ساعته شبیه سازی شده است. هم چنین یک نرخ جریمه برای کنترل توان های مبادله شده میان ریزشبکه ها تعیین شده است. نتایج شبیه سازی انجام شده نشان می دهد که استفاده از سیستم مدیریت انرژی پیشنهادی، سبب افزایش کارایی و بهبود قابلیت اطمینان در هرکدام از ریزشبکه ها می شود.
    کلید واژگان: سیستم مدیریت انرژی توزیع شده, ریزشبکه, منبع تولید پراکنده, توان مبادله شده}
    S. E. Ahmadi, N. Rezaei *
    This paper proposes a flexible distributed energy management system for the coordinated operation of networked microgirds (MGs). Each MGs are considered as distinct entities with local objectives to optimize their own operation costs and power exchanges. The networked MGs are connected by a common bus, which can exchange electrical powers in this way. A two-level algorithm is used to coordinate the operational planning of these MGs. The first level is for the economic operation of each microgrids and the second level is to optimize the power exchanges. The planning of the MGs is simulated by taking into account the power flow equations and voltage constraints in a multi-MG system in a 24-hour period. A penalty price is also defined to control the power exchanges among MGs. The results of simulation indicate that using the proposed energy management system increases the performance and improves the reliability in each of the MGs.
    Keywords: Distributed Energy Management System, microgrid, Distributed Generator, Power Exchange}
  • Gopisetti Manikanta*, Ashish Mani, Hemender Pal Singh, Devendra Kumar Chaturvedi

    Distribution system supplies power to variety of load depending upon the consumer’s demand, which is increasing day by day and lead to high power losses and poor voltage regulation. The increase in demand can be met by integrating Distributed Generators (DG) into the distribution system. Optimal location and capacity of DG plays an important role in distribution network to minimize the power losses. Some researchers have studied this important optimization problem with constant power load which is independent of voltage. However, majority of consumers at load center uses voltage dependent load models, which are primarily dependent on magnitude of supply voltage. In practical distribution network, the assumption of constant power load can significantly affect the location and size of DG, which in turn can lead to higher power losses and poor voltage regulation. In this study, an investigation has been performed to find the increase in power loss due to the use of inappropriate load models, while solving the optimization problem. Furthermore, an attempt has been made in this study to reduce power losses occurring in large test bus systems with loads being dependent on voltage rather than the constant power load. Different test cases are created to analyse the power losses with appropriate load model and in-appropriate load model (constant power load model). The load at distribution network is not mainly dependent on any single type of load model, it is a combination of all load models. In this study, a class of mix load viz., combination of residential, industrial, constant power, and commercial load, is also considered. In order to solve this critical combinatorial optimization problem with voltage dependent load model, which requires an extensive search, Adaptive Quantum inspired Evolutionary Algorithm (AQiEA) is used. The proposed algorithm uses entanglement and superposition principles, which does not require an operator to avoid premature convergence and tuning parameters for improving the convergence rate. A Quantum Rotation inspired Adaptive Crossover operator has been used as a variation operator for a better convergence. The effectiveness of AQiEA is demonstrated and computer simulations are carried out on two standard benchmark large test bus systems viz., 85 bus system and 118 bus system. In addition to AQiEA, four other algorithms (Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Gravitational Search Algorithm (GSA), Grey Wolf Optimization (GWO), and Ecogeography-based Optimization (EBO) with Classification based on Multiple Association Rules (CMAR)) have also been employed for comparison. Tabulated results show that the location and size of DGs determined using in-appropriate load model (constant power load model) has significantly high power losses when applied in distribution system with different load model (other voltage dependent load models) as compared with the location and size of DGs determined using the appropriate load model. Experimental results indicate that AQiEA has a better performance compared to other algorithms which are available in the literature.

    Keywords: Power Loss, Industrial Load, Commercial Load, Residential Load, Distributed Generator, VoltageDependent Load}
  • Ajay Babu Bathula, K.V.S Ramachandra Murthy, Manyala Ramalinga Raju

    Basic Reactive power compensation is provided by capacitor banks and active power compensation is provided by Distributed Generators (DGs) like, Solar, Wind and Mini-hydro power plants.  For obtaining optimal placement of Mini Hydro Power Plants and capacitor banks Water Cycle Algorithm (WCA) is intended. The optimal sizes of Capacitors and DGs chosen are of continuous sizes.   33-Bus and 69-Bus radial  distribution systems are chosen for testing this algorithm to identify potential locations and sizes of Mini hydro and capacitors.   It is found that with the proposed WCA, maximum loss reduction of  79 % is obtained for 33 Bus system and 83.6% for 69 Bus system.  Cost analysis is also presented with three different load levels along with above DGs and Capacitors.  In addition to cost analysis, for the benefit of environment carbon emissions are also calculated and found that there is a reduction of 4,034.57 tons of CO2 emission per year on 33 bus system and 4,607.88 tons of CO2 emission per year on 69 bus system.  It is proved that WCA offers highest loss reduction with minimum sizes of DGs and capacitors compared to any other algorithm available in the literature.  The WCA is easy to implement and the search process is methodic.

    Keywords: Distributed Generator, Capacitive compensation, Water Cycle Algorithm, Distribution Systems}
  • سید عباس طاهر*، سید احمدرضا افسری
    با رشد و توسعه شبکه های قدرت، بهره برداری بهینه از این شبکه ها از اهمیت بالایی برخوردار است. به دلیل هزینه بالای احداث و توسعه این شبکه ها، استفاده از ادواتی جهت بالابردن راندمان و کاهش مشکلات موجود (نظیر کاهش تلفات انرژی، بهبود پروفیل ولتاژ و کاهش جریان عبوری از فیدرها)، امری اجتنابناپذیر می باشد. برای مرتفع نمودن این مشکلات می توان از عنصر جبرانساز موازی شبکه توزیع به نام DSTATCOM استفاده نمود و تا حد امکان این مشکلات را کاهش داد. در این مطالعه به جایابی و تعیین ظرفیت بهینه این المان جهت کاهش حداکثری مشکلات موجود با وجود و بدون وجود منابع تولید پراکنده پرداخته شده است. به همین منظور از الگوریتم ایمنی (Immune Algorithm) که الهام گرفته از سیستم ایمنی و دفاعی جانداران می باشد، استفاده شده است. شبیه سازی بر روی شبکه تست IEEE 33 باسه انجام گرفته است. نتایج شبیه سازی نشان می دهد که با جایابی و تعیین ظرفیت بهینه DSTATCOM می توان به خوبی به مشکلات مذکور فائق آمده و محدودیت های شبکه تامین گردد.
    کلید واژگان: الگوریتم ایمنی, پخش بار جاروب پیش رو, پس رو, شبکه توزیع, منبع تولید پراکنده DG, DSTATCOM}
    Seyed Abbas Taher *, Ahmad Reza Afsari
    Optimum operation of power networks has attracted a great deal of attention considering the latest technological advancement taken place in these networks. Considering the huge costs associated with installation and development of such networks، employing any mean to increase efficiency، reduce loss and operation problems (such as reducing energy losses، improving voltage profile and current reduction of lines) seem to be inevitable. Shunt compensators such as DSTATCOM could be employed for these purposes. In this article، optimal allocation and sizing of this element to mitigate such problems both in the presence of distributed generation (DG) and without it are studied. Hence، immune algorithm (inspired originally by immune system of human body) is employed to simulate such optimization using the IEEE 33-bus standard test system. Results show that proposed method is capable of optimizing the distribution system by presenting optimal allocation and sizing of DSTATCOM.
    Keywords: Immune algorithm, Forward, backward sweep load flow, Distribution network, Distributed generator, DSTATCOM}
نکته
  • نتایج بر اساس تاریخ انتشار مرتب شده‌اند.
  • کلیدواژه مورد نظر شما تنها در فیلد کلیدواژگان مقالات جستجو شده‌است. به منظور حذف نتایج غیر مرتبط، جستجو تنها در مقالات مجلاتی انجام شده که با مجله ماخذ هم موضوع هستند.
  • در صورتی که می‌خواهید جستجو را در همه موضوعات و با شرایط دیگر تکرار کنید به صفحه جستجوی پیشرفته مجلات مراجعه کنید.
درخواست پشتیبانی - گزارش اشکال