Develop and Select A Strategy for Interaction with Stakeholders During the Project Life Cycle in Oil Projects
The aim of this study was to develop and select a strategy for interacting with stakeholders during the project life cycle in oil projects using SWOT matrix in Excel, fuzzy tops method and a proposed mathematical model in Pars Oil and Gas Company.
For this purpose, 9 strengths, 8 weaknesses, 7 threats and 8 opportunities were presented by Swat Processing Matrix and then 15 proposed strategies using the views of a sample of 23 people available from experts in the studied projects. Then, the ranking of strategies was performed by fuzzy topsis method in Excel, and in the last step, the proposed mathematical model was solved in Gamz software and the strategy of interaction with stakeholders was determined.
Findings showed that the numerical value of internal factors was 0.124 and the numerical value of external factors was 0.003. Therefore, the strategic position of the company was in the first area and it is necessary to put aggressive strategies on the agenda of this company. Also, the ranking of strategies was done using fuzzy topsis method and the findings of solving the mathematical model to select the optimal strategy of interaction with stakeholders showed that the results of the mathematical model are different from the result of multi-criteria decision making and each strategy can relate to several conflicts Improve stakeholders.
Originality/Value:
This article adds scientific value by providing a way to identify, prioritize and determine appropriate strategies for interacting with stakeholders.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.