The Effectiveness of the Masonry Condition in Limiting Obligations from the Perspective of Jurisprudence and Law
There are some factors that can pose limit before the performance of obligations and cause obligation to be changed or terminated at all. These factors can have legal or voluntary origins, each of which can be explicit or implicit. Among the factors of administrative origin are the conditions of construction or collusion that can change the obligation. The parties to the obligation in this condition agree to the obligation before or during the contract and make the obligation based on it. The masonry condition without an obligatory statement can be based on the implicit will to change the limits and this can be either increasing or decreasing the obligation and is applicable in property and related rights of individuals and can be an obligation committed to the development and/ or reduce and finally, if not committed to it, could cause the termination or invalidity of the obligation by the parties.
- حق عضویت دریافتی صرف حمایت از نشریات عضو و نگهداری، تکمیل و توسعه مگیران میشود.
- پرداخت حق اشتراک و دانلود مقالات اجازه بازنشر آن در سایر رسانههای چاپی و دیجیتال را به کاربر نمیدهد.